Call: +233 (0) 244 897 212 / +233 (0) 322 039 573
Clients
YEAR CLIENT PROJECT STATUS
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA/ EIA)
2019 Genser Energy Ghana Limited Environmental and Social Impact Assessment (ESIA/ EIA) for the proposed 42.5 MW Natural Gas Combined Cycle Thermal Power Plant (GP Edikan Plant) within the Edikan Mine Concession of Perseus Mining Ghana Limited at Ayanfuri in the Upper Denkyira West District of the Central Region of Ghana to meet local, World Bank, IFC, AfDB and Equator Principles environmental and social safeguard requirements 80% Complete
2019 Tabcon Ghana Limited Environmental and Social Impact Assessment (ESIA/ EIA) and related studies for the proposed Tain 10 MW Hybrid Hydro-Solar Facility and 55 MW Solar PV Farm with ancillary facilities Component of the Renewable Energy, Eco-Tourism and Agriculture Project near Subinso in the Wenchi Municipality of the Bono Region of Ghana to meet local, World Bank, IFC and Equator Principles environmental and social safeguard requirements 70% Complete
2019 Fego Foods Processing Limited Environmental and Social Impact Assessment (ESIA) for the cultivation of organic soybeans and other crops on 66,700 ha of land at Jimle in the Mion District of the Northern Region of Ghana to meet local and international (IFC, WB) environmental and social safeguard requirements 70% Complete
2018 Plantations Socfinaf Ghana (PSG) Limited/ SOCFIN Group Environmental and Social Impact Assessment (ESIA/ EIA) for the proposed palm oil mill with a maximum capacity of 60 metric tonnes per hour at Daboase in the Wassa East District of the Western Region of Ghana to meet local, World Bank and IFC environmental and social safeguard requirements 100% Complete
2017 BTSA Buipe Solar Limited/ BioTherm Energy (SA) Environmental and Social Impact Assessment and related studies (Ecological Studies, Traffic Studies) for the proposed 20 MW Solar PV Facility and 6.5 km transmission line at Buipe in the Central Gonja District of the Northern Region of Ghana to meet local, World Bank, IFC, Equator Principles and OPIC environmental and social safeguard requirements 100% complete
2016 Ministry of Food and Agriculture – Ghana Commercial Agriculture Project (GCAP) and Nine Shortlisted Agribusiness Investors Environmental and Social Impact Assessment (ESIA/ EIA) for 2,900 Hectares Improved Rain-Fed Rice Production Project at Nasia-Nabogo Inland Valley to meet local, World Bank and IFC environmental and social safeguard requirements 100% complete
2016 Atlantic Electric Company/ LMI Holdings Environmental and Social Impact Assessment for (ESIA/ EIA) 120MW Combined Cycle Gas Turbine Power, Associated Light Crude Oil and Natural Gas pipelines and storage facilities at the Tema Free Zone Enclave in Ghana to meet local, World Bank and IFC environmental and social safeguard requirements Suspended
2016 Plantations Socfinaf Ghana (PSG) Limited/ SOCFIN Group Environmental and Social Impact Assessment (ESIA/ EIA) for 1007.21 hectares Oil Palm Plantation Project at Manso, Western Region to meet local, RSPO, World Bank and IFC environmental and social safeguard requirements 100% complete
2015 Accra Metropolitan Assembly (AMA)/ DANIDA/ Slamson Ghana Limited Environmental and Social Impact Assessment (ESIA/ EIA) for the construction, installation and operation of a 800 cubic meter Faecal Sludge Treatment Plant to meet local, DANIDA, World Bank and IFC environmental and social safeguard requirements 100% complete
2015 Volta Aluminium Company Limited (VALCO) Environmental and Social Impact Assessment (ESIA/ EIA) for the construction and operation of a 400MW Dual Fuel Combined Cycle Thermal Power Plant with ancillary facilities (housing, hospital, water treatment) to meet local environmental and social requirements 100% complete
2015 Kwamoka Energy Ghana Limited Kwamoka Group of Companies Environmental and Social Impact Assessment (ESIA/ EIA) of 6MW Biomass Thermal Power Plant at Sokoban in the Ashanti Region of Ghana to meet local environmental and social requirements 100% complete
2014 Alpha Management Solutions, Cyprus /Aquaprima Ghana Limited Environmental and Social Impact Assessment (ESIA/ EIA) for 2000 ton/ year Tilapia Fish Ponds at Torgorme, Volta Region to meet local, World Bank, IFC, Equator Principles, Vital Capital and World Organisation for Animal Health (OIE) environmental and social safeguard requirements 100% complete
2013 Amantin Agro-Processing Company Limited (AACL) Environmental and Social Impact Assessment (ESIA/ EIA) for the construction, installation and operation of a 200 ton per day cassava processing factory to meet local and Standard Chartered environmental and social safeguard requirements 100% complete
2013 Amantin Agro-Processing Company Limited (AACL) Environmental and Social Impact Assessment (ESIA/ EIA) for the establishment and farm maintenance of a 10,000 acres cassava plantation to meet local and Standard Chartered environmental and social safeguard requirements 100% complete
2013 Plantations Socfinaf Ghana (PSG) Limited/ SOCFIN Group Environmental and Social Impact Assessment (ESIA/ EIA)for 18,000 hectares Rubber and Oil Palm Plantation Project at Daboase, Western Region to meet local, RSPO, Forest Stewardship Council, World Bank and IFC environmental and social safeguard requirements 100% complete
2013 BG International (BGI) LLC Environmental and Social Impact Assessment (ESIA/ EIA) for Kumasi Shopping Mall and Nature Park Project to meet local, World Bank and IFC environmental and social safeguard requirements 100% complete
2013 BG International (BGI) LLC Environmental & Social Impact Assessment (ESIA/ EIA) for Mallam Junction Shopping Mall and Hotel Project to meet local, World Bank and IFC environmental and social safeguard requirements 100% complete
2013 Methodist Church Ghana, Kumasi Diocese Environmental & Social Impact Assessment (ESIA/ EIA) or K.O. Methodist Land Re-Development Project to meet local environmental and social requirements 100% complete
2013 Prabong Greenfields/ Vital Capital Environmental & Social Impact Assessment (ESIA/ EIA) for the proposed Prabong Greenfield Community project to meet local, World Bank, IFC, Equator Principles and Vital Capital environmental and social safeguard requirements 100% complete
2013 West African Gas Pipeline Company (WAGPCo), Aboadze Environmental and Social Impact Assessment (ESIA/ EIA) for de-watering of sub-marine pipeline meet local, World Bank, IFC and Equator Principles environmental (including the marine) and social safeguard requirements 100% complete
2012 Ghana Rubber Estates Limited, Takoradi Environmental & Social Impact Assessment (ESIA/ EIA) of 1000-Acre Rubber Plantation Development at KEEA District in the Central Region to meet local, Forest Stewardship Council, World Bank and IFC environmental and social safeguard requirements 100% complete
2012 Ghana Rubber Estates Limited, Takoradi Environmental & Social Impact Assessment (ESIA/ EIA) of 2431 Hectares Rubber Plantation Development at Prestea Huni Valley District in the Western Region to meet local, Forest Stewardship Council, World Bank and IFC environmental and social safeguard requirements 100% complete
2012 GHACEM Limited (Heidelberg Cement Group), Takoradi Environmental and Social Impact Assessment (ESIA/ EIA) for the expansion of the Takoradi Port Cement Manufacturing Facility to meet local and international industry standards 100% complete
ENVIRONMENTAL AND SOCIAL MANAGEMENT PLANS (ESMP/ EMP/ ESMS)
2017 Halliburton International Inc. Ghana Environmental Management Plan covering operations of the Completion Tools Facility, Agona Base to meet local environmental and social requirements 100% Complete
2017 BTSA Buipe Solar Limited/ BioTherm Energy (SA) Environmental and Social Management Plan for the proposed 20 MW Solar PV Facility and 6.5 km transmission line at Buipe in the Central Gonja District of the Northern Region of Ghana to meet local, World Bank, IFC, Equator Principles and OPIC environmental and social safeguard requirements 100% complete
2017 Strategic Security Systems (StratSec) Environmental Management Plan for the operation of a 30.2 MW per annum solar panel manufacturing facility at Kpone in the Greater Accra Region to meet local environmental, social and energy requirements 100% complete
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Environmental and Social Management Plan (ESMP) for the cultivation of a 6710 Jatropha plantation at Yeji to meet local environmental, social and commercial farming requirements 100% complete
2017 KAS Products Limited (Buoho Quarry) Environmental Management Plan for the operation of a stone quarry to meet local environmental, social and small scale mining requirements 100% complete
2017 Esereso Carbon Products Limited Environmental Management Plan for the operation of a plant to convert wood waste into charcoal briquette and heat logs at Esereso to meet local environmental and social requirements 100% complete
2017 Plantations Socfinaf Ghana (PSG) Limited/ SOCFIN Group Environmental Management Plan for the Rubber and Oil Palm Plantations at Daboase, Western Region to meet local, RSPO, Forest Stewardship Council, World Bank and IFC environmental and social safeguard requirements 100% complete
2017 Plantations Socfinaf Ghana (PSG) Limited/ SOCFIN Group Environmental Management Plan for the 1002.7 ha Oil Palm Plantations at Manso, Western Region to meet local, RSPO, Forest Stewardship Council, World Bank and IFC environmental and social safeguard requirements 100% complete
2016 Ministry of Food and Agriculture – Ghana Commercial Agriculture Project and Ask Farms Limited Environmental and Social Management Plan (ESMP) for the proposed 300 Hectares improved Rain-Fed Rice Production at Nasia for Ask Farms in the Northern Region of Ghana to meet World Bank and IFC environmental and social safeguard requirements 100% complete
2016 Ministry of Food and Agriculture – Ghana Commercial Agriculture Project and Akandem Farms Environmental and Social Management Plan for Proposed 300 Hectares improved Rain-Fed Rice Production at Yepalsi for Akandem Farms in the Northern Region of Ghana to meet World Bank and IFC environmental and social safeguard requirements 100% complete
2016 Ministry of Food and Agriculture – Ghana Commercial Agriculture Project and Banse Tropical Foods Limited Environmental and Social Management Plan for Proposed 800 Hectares improved Rain-Fed Rice Production at Nakpaya for Banse Tropical Foods Limited in the Northern Region of Ghana to meet World Bank and IFC environmental and social safeguard requirements 100% complete
2016 Ministry of Food and Agriculture – Ghana Commercial Agriculture Project and Bayerijua Consult & Services Environmental and Social Management Plan for Proposed 100 Hectares improved Rain-Fed Rice Production at Nasia for Bayerijua Consult & Services in the Northern Region of Ghana to meet World Bank and IFC environmental and social safeguard requirements 100% complete
2016 Ministry of Food and Agriculture – Ghana Commercial Agriculture Project ad CSN Lloyd Company Limited Environmental and Social Management Plan for Proposed 400 Hectares improved Rain-Fed Rice Production at Diari for CSN Lloyd Company Limited in the Northern Region of Ghana to meet World Bank and IFC environmental and social safeguard requirements 100% complete
2016 Ministry of Food and Agriculture – Ghana Commercial Agriculture Project and Emtrade Company Limited Environmental and Social Management Plan for Proposed 400 Hectares improved Rain-Fed Rice Production at Kukobila for Emtrade Company Limited in the Northern Region of Ghana to meet World Bank and IFC environmental and social safeguard requirements 100% complete
2016 Ministry of Food and Agriculture – Ghana Commercial Agriculture Project and Libga Farms Environmental and Social Management Plan for Proposed 300 Hectares improved Rain-Fed Rice Production at Tamaligu for Libga Farms in the Northern Region of Ghana to meet World Bank and IFC environmental and social safeguard requirements 100% complete
2016 Ministry of Food and Agriculture – Ghana Commercial Agriculture Project and M Galant Environmental and Social Management Plan for Proposed 200 Hectares improved Rain-Fed Rice Production at Nabogo for M Galant in the Northern Region of Ghana to meet World Bank and IFC environmental and social safeguard requirements 100% complete
2016 Ministry of Food and Agriculture – Ghana Commercial Agriculture Project and Talim Ventures Limited Environmental and Social Management Plan for Proposed 100 Hectares improved Rain-Fed Rice Production at Tamaligu for Talim Ventures Limited in the Northern Region of Ghana to meet World Bank and IFC environmental and social safeguard requirements 100% complete
2016 Ministry of Local Government and Rural Development – Kumasi Metropolitan Assembly (KMA) Environmental and Social Management Plan (ESMP) for Regeneration for the Post Office Square Area, Adum in the Subin Sub-Metro in compliance with the World Bank’s Safeguards Policies under the Local Government Capacity Support Project (LGCSP) financed by the International Bank for Reconstruction and Development (IBRD) 100% complete
2014 Ministry of Local Government and Rural Development – Kumasi Metropolitan Assembly (KMA) Environmental and Social Management Plan (ESMP) for the construction and operation of Rattary Park in compliance with the World Bank’s Safeguards Policies under the Local Government Capacity Support Project (LGCSP) financed by the International Bank for Reconstruction and Development (IBRD) 100% complete
2014 Ministry of Local Government and Rural Development – Kumasi Metropolitan Assembly (KMA) Environmental and Social Management Plan (ESMP) for the construction of a 120 m retaining wall at Petuda in compliance with the World Bank’s Safeguards Policies under the Local Government Capacity Support Project (LGCSP) financed by the International Bank for Reconstruction and Development (IBRD) 100% complete
2014 Ministry of Local Government and Rural Development – Kumasi Metropolitan Assembly (KMA) Environmental Management Plan (EMP) for the gravelling of a 2 km road from Nsenie to Kentekronom in compliance with the World Bank’s Safeguards Policies under the Local Government Capacity Support Project (LGCSP) financed by the International Bank for Reconstruction and Development (IBRD) 100% complete
2014 Halliburton International Inc. Ghana Environmental Management Plan for Bulk Cement Plant Project to meet local, World Bank and IFC environmental and social safeguard standards 100% complete
2014 Halliburton International Inc. Ghana Environmental Management Plan for Warehouse Project to meet local, World Bank and IFC environmental and social safeguard standards 100% complete
2014 FMC Technologies BV Environmental Management Plan for the operation of a sub-sea production system and sub-sea trees manufacturing facility to meet local, World Bank and IFC environmental and social safeguard standards 100% complete
2013 KAS Products Limited (Buoho Quarry) Environmental Management Plan for the operation of a stone quarry to meet local environmental, social and small scale mining requirements 100% complete
2013 Smart Oil Limited Environmental and Social Management Plan (ESMP) for the cultivation of a 6710 Jatropha plantation at Yeji to meet local environmental, social and commercial farming requirements 100% complete
2013 Ayum Forest Products Limited Environmental Management Plan (EMP) for the proposed 50,000 metric tonnes per annum wood processing facility to meet local environmental, social and wood processing requirements 100% complete
2013 Brosa Quarry Environmental Management Plan (EMP) for the proposed 400 cubic metre chipping per day quarry to meet local environmental, social and small scale mining requirements 100% complete
ENVIRONMENTAL AND SOCIAL DUE DILIGENCE AND FEASIBILITY
2019 Ministry of Railway Development/ Pricewaterhousecoopers (PwC) Feasibility Study on the Kumasi Metro Rail Project involving provision of environmental and social considerations and technical advisory as part of the Kumasi Metro Rail Project feasibility study to meet environmental, socio-economic and safety requirements of international funding agencies such as the World Bank, IFC and Equator Principles as well as local laws and regulations. 60% Complete
2018 Ministry of Railway Development/ Pricewaterhousecoopers (PwC) Feasibility Study on Central Spine (Kumasi – Paga Railway Line) Project involving provision of environmental and social considerations and technical advisory as part of the Central Spine Project feasibility study to meet environmental, socio-economic and safety requirements of international funding agencies such as the World Bank, IFC and Equator Principles as well as local laws and regulations. 80% Complete
2016 Vital Capital Group / Darlow Biomass Environmental and Social Due Diligence on ESIA for 1,000 hectares Napia grass plantation and pelleting plant powered by 4MW Biomass fuelled Power plant in compliance with Ghana Environmental Legislations, IFC’s Performance Standards on Environment and Social Sustainability 100% complete
2015 Ghana Port and Harbour Authority/ Ghana Railway Development Authority/ Ministry of Transport (PPP Arrangement) Environmental and Social Feasibility Study for the Boankra Inland Port and Eastern Railway Line Project in accordance with local and World Bank environmental and social safeguard requirements 100% complete
2015 International Finance Corporation (IFC) & Millennium Development Authority (MiDA) Environmental and Social Due Diligence Study as part of the Technical Advisory Services for the introduction of Private Sector Participation (PSP) in the Operations of the Electricity Company of Ghana (ECG) Limited under the Public Private Partnership (PPP) Agreement in compliance to IFC Performance Standards and applicable local environmental, social and energy sector requirements 100% complete
2012 Oriental Consultants/ Japan International Cooperation Agency (JICA) Environmental and Social Consideration Study of 2,850km2 Greater Kumasi Sub-Region taking into consideration local and international requirements 100% complete
PRELIMINARY ENVIRONMENTAL ASSESSMENT
2017 Victory Hospital Preliminary Environmental Assessment for the operation of a private hospital at Asenua in the Ashanti Region of Ghana to meet local environmental, social and health sector requirements 100% complete
2014 Wilkins Engineering Limited/ Asuboa Wood Treatment Limited Preliminary Environmental Report for the proposed wood treatment plant into electricity poles to meet local environmental, social and wood processing requirements 100% complete
2014 Esereso Carbon Products Limited Preliminary Environmental Report (PER) for the installation and operation of a plant to convert wood waste into charcoal briquette and heat logs at Esereso to meet local environmental and social requirements 100% complete
2014 Anita Hotel Preliminary Environmental Report (PER) for the construction and operation of Anita Park located at Ekyawokrom to meet local environmental, social and tourism industry requirements 100% complete
2014 Stellar Logistics Limited Preliminary Environmental Report (PER) for the proposed warehouse for storage of chemicals and spare parts to meet local environmental and social (including chemical management) requirements 100% complete
2014 Sethi Manufacturing Company Limited Preliminary Environmental Report (PER) for the construction and operation of factory to manufacture steel products to meet local environmental and social requirements 100% complete
2014 8 Degrees North Company Limited Preliminary Environmental Report (PER) for the proposed 1 ton oil palm processing plant to meet local environmental and social (including food processing) requirements 100% complete
2014 Korkor Company Limited Preliminary Environmental Report (PER) for 150 tons per month commercial meat and hide processing plant to meet local environmental and social (including food processing) requirements 100% complete
2013 Rural-Sisters Stone Processing Ghana Limited Preliminary Environmental Report (PER) for the proposed quarry and stone crushing facility to meet local environmental, social and small scale mining requirements 100% complete
2013 Stewards Hospital Preliminary Environmental Report (PER) for the proposed hospital and mortuary facility to meet local environmental, social and health sector requirements 100% complete
2013 Chigha Resources Recycling Company Limited Preliminary Environmental Report (PER) for the recycling of used tyres into Residual Fuel Oil (RFO) (4000 litres/ day) to meet local environmental requirements to meet local environmental and social requirements 100% complete
2012 Asuofia Fisheries Ghana Limited Preliminary Environmental Report (PER) for the proposed inland fishery project to meet local environmental requirements to meet local environmental, social and commercial fish farming sector requirements 100% complete
2012 Halliburton International Inc. Ghana Preliminary Environmental Report (PER) for the construction, installation and operation of a warehouse for storage of chemicals and cement processing plant to meet local environmental and social including industry standard requirements 100% complete
2011 Takoradi Renewable Energy Limited Preliminary Environmental Report (PER) for the harvesting of 8,000 hectares of redundant rubber plantation, conditioning and export project to meet local, Forest Stewardship Council, World Bank and IFC environmental and social safeguard requirements 100% complete
2011 Maslenda Fruit Processing Ghana Limited Preliminary Environmental Report (PER) for the construction and operation of a fruit processing facility (20,000 metric tonnes of fruits per annum) to meet local environmental, social and food processing requirements 100% complete
RESETTLEMENT ACTION PLANS
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Development of a Livelihood Restoration, Land Acquisition and Resettlement Plan to cover the cultivation of 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete
2017 BTSA Buipe Solar Limited/ BioTherm Energy (SA) Land Acquisition and Livelihood Restoration Plan for the construction and operation of a 20 MW Solar PV facility and 6.5 km transmission line at Buipe in the Northern Region of Ghana to meet local, World Bank, IFC, Equator Principles and OPIC environmental and social safeguard requirements 100% complete
2017 Continental Blue Investments Ghana Limited (CBIG)/ LafargeHolcim Limited (Switzerland)/ DEG Resettlement Action Plan (RAP) for the construction of a cement grinding and bagging facility with funding from Deutsche Investitions- und Entwicklungsgesellschaft (DEG) to meet World Bank and IFC safeguard requirements 100% complete
2015 Ghana Port and Harbour Authority/ Ghana Railway Development Authority/ Ministry of Transport (PPP Arrangement) Resettlement Action Plan for Boankra Inland Port and Eastern Railway Line Project to meet local and World Bank safeguard requirements 100% complete
2015 Ministry of Local Government and Rural Development – Kumasi Metropolitan Assembly (KMA) Abbreviated Resettlement Action Plan for the Construction of Bus Terminal at Chirapatre in compliance with the World Bank’s Safeguards Policies under the Local Government Capacity Support Project (LGCSP) financed by the International Bank for Reconstruction and Development (IBRD) 100% complete
2015 Ministry of Local Government and Rural Development – Kumasi Metropolitan Assembly (KMA) Abbreviated Resettlement Action Plan for the Construction of Bus Terminal at Kwadaso in compliance with the World Bank’s Safeguards Policies under the Local Government Capacity Support Project (LGCSP) financed by the International Bank for Reconstruction and Development (IBRD) 100% complete
2015 Ministry of Local Government and Rural Development – Kumasi Metropolitan Assembly (KMA) Abbreviated Resettlement Action Plan for the Construction of Bus Terminal at Anwomaso in compliance with the World Bank’s Safeguards Policies under the Local Government Capacity Support Project (LGCSP) financed by the International Bank for Reconstruction and Development (IBRD) 100% complete
SUPPLEMENTARY ENVIRONMENTAL ASSESSMENT
2016 Accra Metropolitan Assembly (AMA)/ DANIDA/ Slamson Ghana Limited Supplementary Environmental Assessment Report (SEAR) for the construction and operation of a 35-50 tons/ day compost plant as an additional component to the Faecal Sludge Treatment Plant to meet DANIDA, World Bank and IFC safeguard requirements 100% complete
2016 Amantin Agro-Processing Company Limited (AACL) Supplementary Assessment Report (SEAR) for proposed construction and installation of Ethanol Plant to meet local and Standard Chartered environmental and social requirements 100% complete
ANNUAL ENVIRONMENTAL REPORTING
2018 Halliburton International Inc. Ghana Annual Environmental Report (AER) for the liquid mud plant, Takoradi, Western Region to meet local environmental requirements including AKOBEN Programme 100% complete
2016 Halliburton International Inc. Ghana Annual Environmental Report (AER) for the liquid mud plant, bulk cement plant and completions tool facility, Takoradi, Western Region to meet local environmental requirements including AKOBEN Programme 100% complete
2016 Plantations Socfinaf Ghana (PSG) Limited/ SOCFIN Group Annual Environmental Report (AER) for 19,007.21 hectares oil palm and rubber plantation in the Mpohor-Wassa East district of the Western Region to meet local, RSPO, Forest Stewardship Council, World Bank and IFC environmental and social safeguard requirements 100% complete
2015 8 Degrees North Company Limited Annual Environmental Report (AER) for the one ton per day oil palm processing plant at Duayaw Nkwanta in the Tano North District of the Brong Ahafo Region to meet local environmental, social and food processing requirements 100% complete
ISO MANAGEMENT SYSTEMS
2019 Ghana Civil Aviation Authority Technical Assistance Towards the Establishment and Implementation of Quality Management System (ISO 9001:2015) in Aeronautical Information Management (AIM) Section of the Ghana Civil Aviation Authority 10% Complete
2019 Savannah Fruits Company Limited Technical Assistance in the establishment of Consultancy Services on the Establishment and Implementation of a Quality Management System (ISO 9001:2015) leading to Certification 90% Complete
2019 Independent Oil Tools (IOT) Ghana Limited Technical Assistance in the establishment of Integrated Management System comprising of Quality Management System (ISO 9001: 2015), Environmental Management system (ISO 14001:2015) and Occupational Health and Safety Management System (OHSAS 18001) and to prepare IOT Ghana for Certification 70% Complete
2018 Greenline Logistics Limited Technical Assistance in the establishment of Integrated Management System comprising of Quality Management System (ISO 9001: 2015), Environmental Management system (ISO 14001:2015) and Occupational Health and Safety Management System (OHSAS 18001) and to prepare Greenline Logistics for Certification 60% Complete
2018 Miniplast Limited Technical Assistance in the establishment of a Quality Management System (ISO 9001: 2015 and to prepare Miniplast for Certification 100% Complete
2018 Axiss Shipping Services Limited (ASSL) Establishment, Implementation, Guidance through Certification and Maintenance of Integrated Management System (ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007) for the Tema, Takoradi and Accra operational locations 100% Complete
2018 Strategic Security Systems (StratSec) Provision of Technical Support to carry out a comprehensive internal audit of Strategic Security System’s Integrated Management System (ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007) 100% Complete
2017 Nigerian Ports Authority (NPA) Preliminary gap assessment of port operations in four (4) pilotage districts against the requirements of Quality Management System (ISO 9001: 2015) 100% complete
2017 Strategic Security Systems (StratSec) Technical Assistance in the establishment of Integrated Management System comprising of Quality Management System (ISO 9001: 2015), Environmental Management system (ISO 14001:2015) and Occupational Health and Safety Management System (OHSAS 18001) and to prepare StratSec for Certification 100% complete
2017 Ramel Business Services Establishment of Integrated Management System in Quality Management System (ISO 9001:2015), Environmental Management system (ISO 14001:2015) and Occupational Health and Safety Management System (OHSAS 18001) 100% complete
2017 Ghana Ports and Harbours Authority (GPHA) Sensitization and Transfer of knowledge programme on Ghana Ports and Harbours Authority (GPHA) as part of the Contract for the Establishment and Implementation of an Integrated Management System and its eventual Certification: (ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007) 100% Complete
2016 Ghana Ports and Harbours Authority (GPHA) Establishment of Integrated Management System in Quality Management System (ISO 9001:2015), Environmental Management system (ISO 14001:2015) and Occupational Health and Safety Management System (OHSAS 18001) 100% complete
2015 RigWorld International Services Establishment of Integrated Management System in Quality Management System (ISO 9001:2007), Environmental Management system (ISO 14001:2007) and Occupational Health and Safety Management System (OHSAS 18001) 100% complete
2009 Carmeuse Lime Products Ghana Limited Establishment, implementation and maintenance of Quality Management System (ISO 9001:2007) 100% complete
OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Development and implementation of an Emergency Response Plan (including Fire Safety) to cover the cultivation of 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Establishment and implementation of Health and Safety Management Plan to cover the cultivation of 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Development and facilitation of a Community Health, Safety and Security Management Plan to cover the cultivation of 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Development and facilitation of a Security Policy and Security Management Plan to cover the cultivation of 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Development and facilitation of a Hazardous Materials Management Plan for the cultivation of 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete
2017 Tacotel Ghana Limited Development of a Health, Safety and Environmental (HSE) Management Plan for the operation of the Takoradi Container Terminal in compliance with good international industry HSE standards 100% complete
2013 Takoradi International Company (TICo) Construction Management Plan (Offshore) for the Ghana T2 (Thermal Plant) Expansion Project in compliance with good international industry HSE standards 100% complete
2008 Archer Daniels Midland (ADM) Cocoa (Now Olam Cocoa) Establishment, Implementation and Maintenance of Health Safety and Environmental (HSE) Management System for Archer Daniels Midland (ADM) Cocoa in accordance with corporate Health, Safety and Environment Policies and Programs 100% complete
ENVIRONMENTAL MONITORING AND COMPLIANCE SUPPORT SERVICES
2018 Halliburton International Inc. Ghana Water quality, Air quality and noise level assessment and reporting at the Bulk Cement Plan consistent with the petroleum sector specific guidelines of the EPA of Ghana 100% complete
2018 Halliburton International Inc. Ghana Water quality, Air quality and noise level assessment and reporting at the Completion Tools Facility, Agona Base consistent with the petroleum sector specific guidelines of the EPA of Ghana 100% complete
2018 Halliburton International Inc. Ghana Water quality, Air quality and noise level assessment and reporting at the Liquid Mud Plant consistent with the petroleum sector specific guidelines of the EPA of Ghana 100% complete
2018 Individual Client Salinity assessment of sea water near Shama Junction as part of feasibility studies for the establishment of a salt manufacturing plant 100% complete
2018 Plantations Socfinaf Ghana (PSG) Limited/ SOCFIN Group Environmental monitoring (water quality) and preparation of a water quality monitoring report at the Manso Plantation consistent with agriculture sector specific guidelines of the EPA of Ghana 100% complete
2018 Plantations Socfinaf Ghana (PSG) Limited/ SOCFIN Group Environmental monitoring (water quality) and preparation of a water quality monitoring report at the Daboase Plantation consistent with agriculture sector specific guidelines of the EPA of Ghana 100% complete
2017 Plantations Socfinaf Ghana (PSG) Limited/ SOCFIN Group Environmental monitoring (water quality) and preparation of a water quality monitoring report at the Daboase and Manso Plantations consistent with agriculture sector specific guidelines of the EPA of Ghana 100% complete
2017 CIMAF Ghana Environmental awareness training for staff of CIMAF Ghana covering relevant environmental aspects, risks and industry standard specific management strategies 100% complete
2016 Halliburton International Inc. Ghana Environmental monitoring (air quality, water quality and noise levels) and preparation of an environmental monitoring report 100% complete
2016 Halliburton International Inc. Ghana Environmental monitoring (air quality, water quality and noise levels) and preparation of an annual environmental report 100% complete
2016 Ministry of Food and Agriculture – Ghana Commercial Agriculture Project (GCAP) and Nine Shortlisted Agribusiness Investors Collection and analysis of surface and groundwater samples and supervision of air quality assessment at nine (9) Agri-Investor sites in the Northern Region of Ghana 100% complete
2015 Plantations Socfinaf Ghana (PSG) Limited/ SOCFIN Group Environmental compliance support services comprising of environmental monitoring (water quality), environmental implementation workshop, awareness training and preparation of annual environmental report and Environmental Management Plan (EMP) 100% complete
2015 Halliburton International Inc. Ghana Environmental monitoring (air quality, water quality and noise levels) and preparation of an environmental monitoring report 100% complete
ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM
2018 Continental Blue Investments Ghana Limited (CBIG)/ LafargeHolcim Limited (Switzerland) Establishment and implementation of Construction Environmental and Social Management System for the construction of a 500,000 MT per annum cement grinding and bagging plant at Tema in the Free Zone Enclave to meet IFC Performance Standard Requirements 100% Complete
2018 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Establishment and implementation of an Environmental and Social Management System to cover the cultivation of 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete
OTHER ENVIRONMENTAL SERVICES
2018 Continental Blue Investments Ghana Limited (CBIG)/ LafargeHolcim Limited (Switzerland) Development and facilitation of a Human Resources Policy and Management Plan for the construction of a cement grinding and bagging plant at Tema in the Free Zone Enclave to meet IFC Performance Standard Requirements 100% Complete
2018 Continental Blue Investments Ghana Limited (CBIG)/ LafargeHolcim Limited (Switzerland) Development and facilitation of a Community Health and Safety Management Plan for the construction of a cement grinding and bagging plant at Tema in the Free Zone Enclave to meet IFC Performance Standard Requirements 100% Complete
2018 Continental Blue Investments Ghana Limited (CBIG)/ LafargeHolcim Limited (Switzerland) Development and facilitation of an Occupational Health and Safety Management Plan for the construction of a cement grinding and bagging plant at Tema in the Free Zone Enclave to meet IFC Performance Standard Requirements 100% Complete
2018 Continental Blue Investments Ghana Limited (CBIG)/ LafargeHolcim Limited (Switzerland) Development of a Security Management Plan for the construction of a cement grinding and bagging plant at Tema in the Free Zone Enclave to meet IFC Performance Standard Requirements 100% Complete
2018 Continental Blue Investments Ghana Limited (CBIG)/ LafargeHolcim Limited (Switzerland) Development of a Traffic Management Plan to guide movement of vehicles and trucks during construction of a cement grinding and bagging plant at Tema in the Free Zone Enclave to meet IFC Performance Standard Requirements 100% Complete
2018 Continental Blue Investments Ghana Limited (CBIG)/ LafargeHolcim Limited (Switzerland) Development of a Waste Management Plan and training to cover the construction of a cement grinding and bagging plant at Tema in the Free Zone Enclave to meet IFC Performance Standard Requirements 100% Complete
2018 Continental Blue Investments Ghana Limited (CBIG)/ LafargeHolcim Limited (Switzerland) Development of a Hazardous Material Management Plan for the construction of a cement grinding and bagging plant at Tema in the Free Zone Enclave to meet IFC Performance Standard Requirements 100% Complete
2018 Continental Blue Investments Ghana Limited (CBIG)/ LafargeHolcim Limited (Switzerland) Development of an Emergency Preparedness and Response Plan for the construction of a cement grinding and bagging plant at Tema in the Free Zone Enclave to meet IFC Performance Standard Requirements 100% Complete
2018 Continental Blue Investments Ghana Limited (CBIG)/ LafargeHolcim Limited (Switzerland) Development of a Supplier Policy and Management Plan and a Contractor Management Plan to guide the engagement of external providers during construction of a cement grinding and bagging plant at Tema in the Free Zone Enclave to meet IFC Performance Standard Requirements 100% Complete
2017 BTSA Buipe Solar Limited/ BioTherm Energy (SA) Equator Principles Action Plan to address any Equator Principles gaps in the Environmental and Social Impact Assessment for the proposed 20 MW Solar PV Facility and 6.5 km transmission line at Buipe in the Central Gonja District of the Northern Region of Ghana 100% complete
2017 BTSA Buipe Solar Limited/ BioTherm Energy (SA) Stakeholder Engagement Plan for the proposed 20 MW Solar PV Facility and 6.5 km transmission line at Buipe in the Central Gonja District of the Northern Region of Ghana to meet local, World Bank, IFC, Equator Principles and OPIC social safeguard requirements 100% complete
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Development of Stakeholder Engagement Plan (including a grievance redress) to cover the cultivation of 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Development and facilitation of a Fertiliser and Crop Nutrient Management Plan to cover the cultivation of 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Development and facilitation of a Soil Erosion Control Plan to cover the cultivation of 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Development of a Biodiversity Management Plan to cover the cultivation of 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Development of a Community Development Plan to manage Community Funds for communities in the catchment of the 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Development and facilitation of a Human Resources Policy and Management Plan (including Internal Grievance Redress Procedure) to cover the cultivation of 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Development of a Chance Find Procedure (for cultural resources) to cover the cultivation of 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Development and facilitation of a Pesticide Management Plan for the cultivation of 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Development and facilitation of a Waste Management Plan for the cultivation of 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete
2017 Smart Oil Limited/ JOil Africa Pte. Ltd. (Singapore) Development and facilitation of an Integrated Pest Management Plan for the cultivation of 6,710 hectares of Jathropha Plantation at Yeji to meet the IFC Performance Standards requirements 100% complete