Environmental and Social Feasibility Study for the Boankra Inland Port and Eastern Railway Line Project
single page feature image

    Project Details

  • Category :
  • Client : Ghana Port and Harbour Authority/ Ghana Railway Development Authority/ Ministry of Transport (PPP Arrangement)
  • Location : From Tema to Kumasi (330 km) along Eastern Railway Line Corridor (Greater Accra, Eastern and Ashanti Regions)
  • Date : 2015 - 2016
  • Link :

Environmental and Social Feasibility Study for the Boankra Inland Port and Eastern Railway Line Project

Environmental and Social Feasibility Study for the Boankra Inland Port and Eastern Railway Line Project in accordance with local and World Bank environmental and social safeguard requirements under a Public Private Partnership arrangement

Project Details:

The project involved review of proposed railway designs and alignment in relation to the existing baseline environmental and social conditions to determine the feasibility of the proposed project including recommendations for managing critical environmental impacts and social safeguard/ health/ safety risks including resettlement. It also involved consultations and reporting in line with World Bank and IFC environmental and social safeguard requirements.

 

Our experts performed the following activities:

  • Proposed railway design and alignment review.
  • Identification of risk and impact hotspots
  • Detailed risk and impact assessment
  • Geospatial analysis
  • Site visit and collection of baseline information
  • Stakeholder consultations
  • Compilation of inception report
  • Preparation of Environmental and Social Pre-feasibility report
  • Compilation of Full Environmental and Social Feasibility Report.