2024: Ministry of Food and Agriculture (MoFA), under the West Africa Food System Resilience Project

Phase2 (FSRP2):

Environmental and Social Impact Assessment (ESIA) for selected inland valleys in the Kintampo North Municipality of the Bono East Region, Ghana.

 

2023: Ministry of Food and Agriculture (MoFA), under the West Africa Food System Resilience Project

Phase 2 (FSRP):

Environmental and Social Impact Assessment (ESIA) for selected inland valleys in the Kintampo North Municipality of the Bono East Region, Ghana.

 

2023: TFI-GRIPS SOLAR 1 Co, Ltd:

Environmental and Social Impact Assessment (ESIA) for the Hiowe Solar PV Transmission Line; Providing ESIA updates for the Hiowe Solar PV Sites; as well as Technical and Implementation of a Livelihood Restoration Plan (LRP) for the Transmission Line.

 

2022: United Nations World Food Programme (UN-WFP):

Environmental and Social Impact Assessment (ESIA) for the proposed UN-WFP Regional Fleet Training Centre at Kotoka International Airport (KIA) in the La Dade-Kotopon Municipality of the Greater Accra Region to meet local, World Bank and IFC environmental and social
safeguard requirements

 

2021: Sinohydro Corporation Limited:

Environmental and Social Impact Assessment (ESIA) for the proposed Upgrade of Existing Water Supply Systems with Supervisory Control and Data Acquisition (SCADA) And Leakage Repair & Protection within the Greater Accra Metropolitan Area (GAMA) requirements.er Accra Region, Ghana to meet local, World Bank and IFC environmental and social safeguard requirements

 

2021: Continental Blue Investments Ghana Limited (CBIG):

Environmental and Social Impact Assessment (ESIA) for the proposed expansion of its cement grinding and bagging plant to 1.5 million tonnes per annum to meet local, World Bank and IFC environmental and social safeguard requirements

 

2021: Plantations Socfinaf Ghana (PSG) Limited/ Socfin Group, Singapore:

Social and Environmental Impact Assessment (SEIA) for PSG’s 60 MT/hr Palm Oil Mill as well as over 19,000 ha rubber and oil palm plantations
at Daboase and Manso in the Western Region of Ghana to meet local, RSPO, World Bank and IFC environmental and social safeguard requirements

 

2021: Kumasi Cement Ghana Limited:

Environmental and Social Impact Assessment (ESIA) for the proposed 1.2 Million tonnes per annum cement grinding and bagging plant at Awisem near Offinso in the Offinso Municipality of the Ashanti to meet local, World Bank and IFC environmental and social safeguard requirements

 

2020: TFI-GRIPS Solar 1 Company Limited/WSP Inc, SA:

Environmental and Social Impact Assessment (ESIA) for the ~6.0 km Hiowe Solar PV Transmission Line; Providing ESIA Updates for the 60MW Hiowe Solar PV Site; as well as Technical Inputs and Implementation of a Livelihood Restoration Plan (LRP) for the Transmission Line to meet local, World Bank, IFC and Equator Principles environmental and social safeguard requirements

 

2020: Holysun R&B Engineering/ Ghana Highway Authority/ Ministry of Roads and Highways:

Environmental and Social Impact Assessment (ESIA) for the proposed ~104 km Trans coastal Highway Accra Outer Ring Road Section (Phase I, II & III) Project traversing the Greater Accra, Eastern and Central Regions of Ghana to meet local, World Bank, IFC and Equator Principles environmental and social safeguard requirements

 

2020: PowerChina International Group/ Ghana Irrigation Development Authority (GIDA):

Environmental andSocial Impact Assessment and Environmental and Social Management Plan (ESMP) for the proposed Pwalugu
Irrigation Project covering 26,000 hectares of arable land in the West Mamprusi Municipality of the North East Region of Ghana to meet local, World Bank, IFC and Equator Principles environmental and social safeguard requirements

 

2020: Genser Energy Ghana Limited:

 Environmental and Social Impact Assessment for the proposed 82 km natural Gas Pipeline Infrastructure Project in the Ashanti, Central and Western Regions of Ghana to meet local, World Bank, IFC and Equator Principles environmental and social safeguard requirements


2020: Kwamoka Energy Ghana Limited/ Kwamoka Group of Companies/ Deutsche Gesellschaft für Internationale Zusammenarbeit GmbH (GIZ):

Review and Update of Environmental and Social Impact Assessment for 6MW Biomass Thermal Power Plant at Sokoban in the Ashanti Region of Ghana to meet IFC Performance Standard requirements


2019: Genser Energy Ghana Limited:

Environmental and Social Impact Assessment for the proposed 42.5 Gas Combined Cycle Thermal Power Plant (GP Edikan Plant) within the Edikan Mine Concession of Perseus Mining Ghana Limited at Ayanfuri in the Upper Denkyira West District of the Central Region of Ghana to meet local, World Bank, IFC, AfDB and Equator Principles environmental and social safeguard requirements


2019: Tabcon Ghana Limited:

Environmental and Social Impact Assessment and related studies for the proposed Tain 10 MW Hybrid Hydro-Solar Facility and 55 MW Solar PV Farm with ancillary facilities Component of the Renewable Energy, Eco-Tourism and Agriculture Project near Subinso in the Wenchi Municipality of the Bono Region of Ghana to meet local, World Bank, IFC and Equator Principles environmental and social safeguard requirements


2019: Fego Foods Processing Limited:

Environmental and Social Impact Assessment (ESIA) for the cultivation of organic soybeans and other crops on 66,700 ha of land at Jimle in the Mion District of the Northern Region of Ghana to meet local and international (IFC, WB) environmental and social safeguard requirements


2018: Plantations Socfinaf Ghana (PSG) Limited/ SOCFIN Group:

Environmental and Social Impact Assessment for the proposed palm oil mill with a maximum capacity of 60 metric tonnes per hour at Daboase in the Wassa East District of the Western Region of Ghana to meet local, World Bank and IFC environmental and social safeguard requirements


2017: BTSA Buipe Solar Limited/ BioTherm Energy (SA):

Environmental and Social Impact Assessment and related studies (Ecological Studies, Traffic Studies) for the proposed 20 MW Solar PV Facility and 6.5 km transmission line at Buipe in the Central Gonja District of the Northern Region of Ghana to meet local, World Bank, IFC, Equator Principles and OPIC environmental and social safeguard requirements


2016: Ministry of Food and Agriculture – Ghana Commercial Agriculture Project (GCAP) and Nine Shortlisted Agribusiness Investors:

Environmental and Social Impact Assessment for 2,900 Hectares Improved Rain-Fed Rice Production Project at Nasia-Nabogo Inland Valley to meet local, World Bank and IFC environmental and social safeguard requirements


2016: Atlantic Electric Company/ LMI Holdings:

Environmental and Social Impact Assessment for 120MW Combined Cycle Gas Turbine Power, Associated Light Crude Oil and Natural Gas pipelines and storage facilities at the Tema Free Zone Enclave in Ghana to meet local, World Bank and IFC environmental and social safeguard requirements


2016: Plantations Socfinaf Ghana (PSG) Limited/ SOCFIN Group:

Environmental and Social Impact Assessment for 1007.21 hectares Oil Palm Plantation Project at Manso, Western Region to meet local, RSPO, World Bank and IFC environmental and social safeguard requirements